The Cherrywood Viaduct involved the construction of a 600m long light rail viaduct (including a 40m section of road over bridge on the Wyattville Link Road) forming part of the Luas Line B2 extension from Sandyford to Cherrywood and ultimately to Bray. The structure varies in height up to 12m and in width from 8m to 12m.